{"id":1556,"date":"2016-09-22T12:12:34","date_gmt":"2016-09-22T11:12:34","guid":{"rendered":"http:\/\/www.l-plan.si\/?p=1556"},"modified":"2017-02-07T16:52:41","modified_gmt":"2017-02-07T15:52:41","slug":"on-side-testing-safety-valves-with-legatest-and-repair-of-valves-and-testing-csprs-systems-in-ses-kardia-ppc-greece","status":"publish","type":"post","link":"https:\/\/www.l-plan.si\/en\/on-side-testing-safety-valves-with-legatest-and-repair-of-valves-and-testing-csprs-systems-in-ses-kardia-ppc-greece\/","title":{"rendered":"On-site Safety Valves and Pneumatic Control Units Testing, Valves Maintenance &#038; Inspection"},"content":{"rendered":"[vc_row][vc_column][vc_column_text]L-plan engineers performed on-site safety valves testing with the Legatest device in SES Kardia PPC Greece Power plant.<\/p>\n<p>In the same time we performed also Pneumatic Control Units Testing \u00a0and Maintenance \/ Inspection of some safety valves, In \u00a0the period between 15.9.2014 and 22.9.2014.<\/p>\n<p>L-plan successfully ended the development and production of new high accuracy testing device \u2013 Legaline CSPRS in 2014.<\/p>\n<p>With new device all types of Pneumatic control unit devices (Pneumatic Supplementary \u00a0Loading \u00a0Systems) can be tested on-line, on-site, during operation.<\/p>\n<p>Pneumatic control unit as same as spring loaded safety valves testing is performed according to standard <em>EN ISO 4126-5-2013; Testing of safety valves for protection against excessive pressure \u2013 Controlled safety pressure relief systems \u2013 CSPRS.\u00a0<\/em><\/p>\n<p>Further testing will be performed in the month of November.<\/p>\n<p><a href=\"https:\/\/www.l-plan.si\/en\/services\/valves-repairing-and-inspection\/\">Read more about valves repairing, testing and inspection\u2026<\/a><\/p>\n<p><a href=\"https:\/\/www.l-plan.si\/en\/products\/legatest\/\">Read more about L-plan on line Safety valve testing device Legatest<\/a><\/p>\n<p><a href=\"https:\/\/www.l-plan.si\/en\/products\/csprs\/\">Read more about L-plan on line Control Units Testing device Legaline CSPRS<\/a><\/p>\n<p>22.9.2014[\/vc_column_text][\/vc_column][\/vc_row]\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text]L-plan engineers performed on-site safety valves testing with the Legatest device in SES Kardia PPC Greece Power plant. In the same time we performed also Pneumatic Control Units Testing \u00a0and Maintenance \/ Inspection of some safety valves, In \u00a0the period &hellip;<\/p>\n","protected":false},"author":5,"featured_media":3372,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.l-plan.si\/en\/wp-json\/wp\/v2\/posts\/1556"}],"collection":[{"href":"https:\/\/www.l-plan.si\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.l-plan.si\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.l-plan.si\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.l-plan.si\/en\/wp-json\/wp\/v2\/comments?post=1556"}],"version-history":[{"count":4,"href":"https:\/\/www.l-plan.si\/en\/wp-json\/wp\/v2\/posts\/1556\/revisions"}],"predecessor-version":[{"id":4211,"href":"https:\/\/www.l-plan.si\/en\/wp-json\/wp\/v2\/posts\/1556\/revisions\/4211"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.l-plan.si\/en\/wp-json\/wp\/v2\/media\/3372"}],"wp:attachment":[{"href":"https:\/\/www.l-plan.si\/en\/wp-json\/wp\/v2\/media?parent=1556"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.l-plan.si\/en\/wp-json\/wp\/v2\/categories?post=1556"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.l-plan.si\/en\/wp-json\/wp\/v2\/tags?post=1556"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}