
Sulfur Condensers Re-tubing in Mellitah Oil & Gas B.V. Libya
In cooperation with company INTECH Libya, re-tubing service of two sulfur condensers was performed. Re-tubing service was carried out under the direction of Petrokemija Kutina experts in the Mellitah Oil & Gas B.V. Libya site.
Minor problems were with the supply of suitable materials, equipment and pipes, but the work was successfully completed in three weeks.
Condensers are currently on the stock. We expect that L-plan Inspectors will perform repairing conformity assessment procedures in cooperation with experts from TÜV SÜDSava Slovenia. A pressure strength & tightness test and final Inspection before operation shall be carried out.
Bozo Legat, 2013