With the new device Legaline CSPRS first tested CSPRS systems for regulating the safety valves, as well as the testing safety valves during operation (On-site).

In the period from 13.5.2014 to 16.5.2014 were tested CSPRS systems in Total Raffinerie Mitteldeutschland GmbH, Leuna

The work was are organized by L-Plan Service Gmbh Germany.

Testing of safety valves on site with Legatest device and testing of CSPRS systems.

16.5.2014